WHITLAM

SPACELAB was engaged by the SLA (Suburban Land Agency) to review the North Molonglo transport linkages, develop a structure plan & a detailed estate master plan ...

Read More

MICRO APARTMENTS

SPACELAB was engaged to interrogate the site potential and approval potential for a “build to rent” apartment building, specifically for micro apartments.

Read More

ANGAS ST CHILDCARE

SPACELAB was engaged to provide statutory planning services, landscape architecture and community consultation services for a new childcare centre in the heart of Ainslie.

Read More

60 TORRENS ST BRADDON

SPACELAB was engaged by the client to reconsider an existent, but long expired development approval on the site. This reconsideration included...

Read More

FORDE DOG PARK

SPACELAB was responsible for the concept design, documentation, and detailed design. Consideration for the safety of dogs and their owners and careful attention to ecology and conservation was paramount.

Read More

WOLLONDILLY RIVER WALK

SPACELAB was engaged by the Goulburn Mulwaree Council to provide conceptual design for a series of spaces along an existing pedestrian network adjacent to the Wollondilly River in Goulburn.

Read More

STS PETER AND PAUL’S OLD CATHEDRAL

The restoration and redevelopment of the precinct of Sts Peter and Paul’s Old Cathedral is of great cultural and economic significance...

Read More

GOOGONG NH 3-5

SPACELAB’s design acknowledged the site’s natural constraints and offered a strong visual and physical connection to the unique environment in which Googong is located.

Read More

COMMON GROUND

SPACELAB was originally engaged to review and reconsider the masterplan of the Section 72 Precinct and to engage in community consultation run across a number of sessions with the Dickson…

Read More

MACLEAY TERRACES

SPACELAB was engaged to undertake the Development Application, landscape masterplan design and construction documentation for an integrated residential ...

Read More